Slab

Once the lot is cleared and fill dirt is compacted to the correct height in the area where the house will be, formboards are set along the house perimeter to contain the concrete during the concrete pour. Laser levels are use to ensure correct elevation and a survey will make sure that formwork is correct.

Plumbing pipes and drain lines are then installed and the dirt is once again compacted. The project is now ready for termite spray, Visqueen and steel.

Steel reinforcement bars are installed in the footers, up-rods are put in place to connect the slab to the future block walls, and sheets of wire mesh are laid out over the entire floor area. Once the steel work is completed and the inspections are passed, concrete is poured and finished.